Lifeline Wells - Benin

Project 03

Goal

900

KD

Collected

39

KD

Rest

861

KD

0% 4% 100%

Project Description

An artesian well located at a depth of 40 to 100 meters, equipped with a solar-powered electric pump and a 2000-liter tank, serving 1500 to 2000 people.
License Number: 2025/J1/AKh5
Approval Start Date: 19/8/2025
Approval Expiry Date: 31/12/2026
Cash collection is prohibited.
The administrative fee shall not exceed 12.5%, in accordance with the instructions of the Ministry of Social Affairs.

The importance of the project

1 Improving access to clean water in remote areas, which improves the quality of life for residents and alleviates their suffering.
2 Reducing water diseases by providing clean and healthy water and improving public health in the community.
3 Stimulating sustainable development: The wells project can contribute to improving the economic and social conditions of the beneficiary communities, as water availability enhances agriculture and livestock production.

Project Description

An artesian well located at a depth of 40 to 100 meters, equipped with a solar-powered electric pump and a 2000-liter tank, serving 1500 to 2000 people.
License Number: 2025/J1/AKh5
Approval Start Date: 19/8/2025
Approval Expiry Date: 31/12/2026
Cash collection is prohibited.
The administrative fee shall not exceed 12.5%, in accordance with the instructions of the Ministry of Social Affairs.

The importance of the project

1 Improving access to clean water in remote areas, which improves the quality of life for residents and alleviates their suffering.
2 Reducing water diseases by providing clean and healthy water and improving public health in the community.
3 Stimulating sustainable development: The wells project can contribute to improving the economic and social conditions of the beneficiary communities, as water availability enhances agriculture and livestock production.

Donate by
KD

By registering mobile number, you will receive SMS with dontation.

Our nobel donor

The donation will be turned into a public contribution if the project is not completed in six months

Al-Khair Ambassador

Subscribe to the "Al-Khair Ambassador" service to publish Namaa's charitable projects